Next stage

In a matter of a day or two I can start to apply the release agents and then start with the mold making.


The fairing is not completely modified yet, but further work will be done after the exhaust is done.

















Front view, air intake to the radiator.























Other side, throttle cables will not go down like this, they will enter the
airbox horizontally.















The fuel tank is obviously missing here, it will be under the airbox.


Intake

The air-intake for the radiator is complete, at least för the mockup fairing.

The mould




















2mm "step" with the use of sheet wax was made, and then bagging.





















 Mounted in the mockup fairing.



soon

Not long to go now before the subframe is 100%, it will be very nice to go in next stage,
waxing and mould making.